ZG2 handle with load cell
Better load control and less force for the operator, with an ergonomic handle with a load cell.
Retrofit kit from ZG1 to ZG2 level, or handle and push-button box on an existing manipulator.

The challenge
On a standard ZG1, moving the load up or down takes a direct force of about 10% of the load, which strains the operator and affects cycle time.
The solution
In balancing mode, a direct force of 2–3% of the load is enough. The handle has an integrated load cell, and the up/down push-button box mounts on the handle or on the manipulator. Two potentiometers adjust the up and down speeds on site.
Technical data
| Direct force | 2–3% of the load, against about 10% on a standard ZG1 |
|---|---|
| Handle | Ergonomic, with integrated load cell |
| Push-button box | Up/down, on the handle or on the manipulator |
| Speed | Two potentiometers for up and down |
| Fits | Existing ZG1 balancers and manipulators |
| Manipulator safety interlock | Not included, available on request |
These figures apply to this example. Your solution is designed around your application. Price and delivery time depend on the project and are stated in the quote. The Ingersoll Rand products and the additional solution components are covered by the full manufacturer warranty.
Describe your task
Do you have a similar task? Tell us what needs to be done and we will go through it together with the Ingersoll Rand engineering team.
More examples
A straight tool does not fitIQi angle version: Angle head for 5 Nm or 15 Nm input torque.
The tool must sit on a machineIQi machine mount: Flange with 2 holes or L-shape with 4 holes.
Several fasteners at onceSix-spindle controlled tightening: Six fasteners in a single controlled operation.
Too heavy to lift by handJib crane with air balancer: Up to 160 kg at 7 bar, 4,800 mm working radius.Standard range